logo
  • About SFT
  • Contact Us
  • Products
    • Cross Roller Bearing
    • Cross Roller Bearing for Strain-Wave Reducer
    • Gonio Way (Cross Roller Guide)
    • Cross Roller Slide Rail
    • Positioning Stage: Cross Roller Guiding
    • Positioning Stage : Linear Ball Guiding
    • Positioning Stage : Dovetail Guiding
    • Rotary Stage
    • Laboratory Jacks
    • Shrink Fit Machine
    • POLISHING MACHINE
    • Technical Information
  • Download
  • Q&A
  • Media
  • News
  • Sitemap
    Products
  • Cross Roller Bearing
  • Cross Roller Bearing for Strain-Wave Reducer
  • Gonio Way (Cross Roller Guide)
  • Cross Roller Slide Rail
  • Positioning Stage: Cross Roller Guiding
    • SEMX (Single Axis)
    • SEMY (Dual Axis)
    • SEMZL (Z Axis)
    • SEMYW (Dual Axis-Thin Type)
    • Heavy Loading & High lead
  • Positioning Stage : Linear Ball Guiding
    • X Axis
    • Z Axis
    • Horizontal-Z-Axis
  • Positioning Stage : Dovetail Guiding
    • Rack & Pinion
    • Rack & Pinion (Long Stroke)
    • Thin Type
    • Feeding Screw
    • Feeding Screw (High Lead)
    • α Axis and αβ Axis
  • Rotary Stage
    • Rotary Stage
  • Laboratory Jacks
    • Z Axis
  • Shrink Fit Machine
  • POLISHING MACHINE
  • Technical Information
    • Cross Roller Bearing
    • Gonio Way
    • Positioning Stage
  • SFT HOME
  • Products > Technical Information > Gonio Way > Installation sequence

Installation sequence

Installation sequence
1. First clean the sliding ways and the installation surface on the seat to prevent the entry of foreign objects during installation. ♦ Figure 3 Installation method
2. Apply lube oil with low viscocity onto each installation surface and lock gonio ways a, b, c and each surface using the suggested torque force (figure 3-1)
3. Temporarily lock gonio way d (figure 3-2).
4. Remove the retaining screws from any end and insert the roller retainers into the central position of the gonio way; upon the completion of the above operations, restore the screw to its original position. (figure 3-3)
5. Try moving the sliding way horizontally to its maximal traveling end and adjust the roller retainer to its central position.
6. Install a dial gauge at the side of the sliding way base level.
7. Move the sliding way to the traveling end at any side and slightly lock pre-stressed adjustment screw above the roller retainer. (figure 3-5)
8. Move the sliding way to the traveling end at the other side and slightly lock pre-stressed adjustment screw. (figure 3-6)
9. Move the sliding way to the central position and slightly lock the adjustment screw at the central position (figure 3-7).
10. Repeat operations from (7) to (9) until there is no gap in horizontal direction.  Caution against applying excessive pre-stressed loads.
11. Once there is no gap in the horizontal direction, the dial deflection on the gauge is minimal and stable when the sliding way is moved horizontally; at this time carry out final calibration of the pre-stressed loads by repeating operations from (7) to (9) using the torque force recommended for locking screws.
12. Tighten the gonio way d which is temporarily locked in the sequence for locking pre-stressed adjustment screws. ♦ Torque force recommended for locking screws
unit:N.m
Models values of locking
torque force
M2 0.3
M2.5 0.6
M3 1.3
(stainless steel screws)

 

 

盛豐

總代理   Exclusive Distributor

關係企業   Affiliated Company

SF Technology CO., LTD.
TEL:(886 6)2703518 FAX:(886 6)2703510
ADD:No.22, Aly. 53, Ln. 428, Sec. 3, Wenhua Rd., Rende Dist., Tainan City 717, Taiwan (R.O.C.) Contact:Sales04@sftechnology.com.tw

Copyright 2024  SF TECHNOLOGY CO.,LTD ALL RIGHTS RESERVED.Website Designed By RENU

Copyright 2024  ©SF TECHNOLOGY CO.,LTD ALL RIGHTS RESERVED.
Website Designed By RENU

總代理 Exclusive Distributor

關係企業 Affiliated Company